Energy Development Corporation
Specialist-Environmental Sustainability
Job Location
Italia, Italy
Job Description
Specialist-Environmental Sustainability page is loaded Specialist-Environmental Sustainabilitylocations: EDC Rockwell Business Center Tower 3time type: Full timeposted on: Posted Todayjob requisition id: JR00004053 Unleash your energy within! Be a part of the EDC Team!September-October 2025: Closure Report on Identified Gaps – conducts improvement initiatives to close out the identified gaps in the inventory of the environmental sustainability performance parameters in preparation for the ESG assuranceOctober 2025-March 2026: Project Coordinator on ESG External Assurance - serves as the project coordinator for the ESG external assurance which will include desktop reviews, interviews and site visits of auditorsApril-June 2026: Draft Standard Protocols on Scope 3 Inventory – draft and cascade standard protocols on data collection including evidence documents and computation of Scope 3 GHG Emissions.July-September 2026: Assessment Report on the Top 10 Vendors with the Highest Scope 3 Emissions – conducts an assessment on the top 10 vendors of the company with the highest Scope 3 emissions and identify opportunities for decarbonization.October 2026-March 2027: Project Coordinator on ESG External Assurance with Scope 3 emissions - serves as the project coordinator for the ESG external assurance which will include desktop reviews, interviews and site visits of auditors. For this cycle, it will now include Scope 3 emissions.March – May 2027: Environmental Module of the Integrated Report with Scope 3 emissions – drafts the performance on GHG, water and waste under the Environmental module of the Integrated Report. For this cycle, the report will include a detailed disclosure of Scope 3 emissions.Energy Development Corporation is a geothermal energy industry pioneer and the recognized world leader in wet steam field technology. In the Philippines, EDC is the largest vertically integrated geothermal company, delivering 1,475MW of clean and renewable energy. We continue to diversify our renewable energy portfolio through investments in hydropower, solar power and wind energy projects in the Philippines. With almost 40 years of geothermal mastery, EDC is set to deliver the benefits of sustainable geothermal development to communities around the world as it ventures into Latin America and Indonesia.EDC is part of the First Gen Corporation (“First Gen”) Group, which has the largest portfolio of power plants using clean and renewable technology in the Philippines. First Gen’s 16 power generation plants have a combined capacity of 2,763MW. First Gen has one of the cleanest power portfolios in the country with its entire power generation portfolio utilizing fuels such as geothermal steam, water, and natural gas.Wind power complements EDC’s existing power generation assets including the baseload geothermal plants, as well as, the Pantabangan hydroelectric plant, which serves as a peaking plant.EDC has become the leading geothermal energy producer in the Philippines through the successful development and operation of numerous geothermal energy projects. Since 1983, the Company has successfully developed, financed, built, and operated seven geothermal steamfields in five geothermal contract areas, containing both wet and dry steam. These steamfields currently supply geothermal steam to geothermal power plants with an aggregate installed capacity of 1,130 MW. In addition, the Company currently, directly and indirectly, owns and operates eleven geothermal power plants with a total installed capacity of 1,181 MW. EDC, through its indirect wholly owned subsidiary Green Core Geothermal, Inc., operates the 192.5MW Palinpinon and 112.5MW Tongonan geothermal power plants. Bacman Geothermal, Inc., another indirect wholly owned subsidiary of EDC, operates the 130MW Bacman geothermal power plant. The Company believes this track record has enabled it to develop the expertise needed to assess the feasibility of future acquisitions and greenfield projects, ensure the safe and efficient construction of power plants, and provide for efficient power plant operations.We have the best-qualified and trained professionals, technical people and support staff who persist in always bringing EDC to industry leadership. The company’s geothermal team has over 40 years of technical and management experience in the geothermal industry. We also have a core team geoscientists and engineers who are holders of degrees from Geothermal Institutes in Iceland, Italy, New Zealand and Japan.We are guided by the following distinct Lopez Group values:* A Pioneering Entrepreneurial Spirit* Business Excellence* Unity* Nationalism* Social Justice* Integrity* Employee Welfare and WellnessWe know from generations of experience that it is by living according to these values that a company can be built to last. J-18808-Ljbffr
Location: Italia, IT
Posted Date: 9/16/2025
Location: Italia, IT
Posted Date: 9/16/2025
Contact Information
Contact | Human Resources Energy Development Corporation |
---|